Custom Build Bungalow at Arodes

 

Click for Paphos, Cyprus Forecast

Click here for Jan 12 - to date    The Latest

Click here for Sep 11 - Dec 11    

Click here for Aug - Nov 09

Click here for May - Jul 09

Click here for Feb - Mar 09

Click here for Dec - Jan 09

Click here for Oct - Nov 08 

Click here for Jul - Sep 08

Click here for May - Jun 08 

This page = Mar - Apr 08  

Click here for Jan - Feb 08

Click here for Nov - Dec 07

Click Here for Sep - Oct 07 

Click here for Oct 06 - Aug 07   The Start

Click here for Plan View

 

 

 

 

 

7 March 2008

Basement walls have been back-filled and compressed ready for shuttering for the ground floor slab. The ground floor slab will cover the basement area plus the ground shown levelled in the photo. The internal shuttering for the basement walls has also been removed.

 

 

 

 

 
 

 

 

7 March 2008

Same day as above, photo taken from the edge of the ground slab area. The in-fill was rock hard core which was then compressed / rollered.

 

 

 

 

 
 

 

 

10 March 2008

Constructing the shuttering for the
ground floor slab

 

 

 

 

 

 
 

 

 

13 March 2008

Progress on the shuttering for the
ground floor slab.
The boards over the basement are held up by scaffolding and concrete will be poured onto the boards

 

 

 

 

 
 

 

 

22 March 2008

Starting on the steel reinforcing work

 

 

 

 

 

 
 

 

 

23 March 2008

Inspection by two "experts"

 

 

 

 

 

 
 

 

 

30 March 2008

Iron work finished.
Ready for pouring concrete to make
the ground floor slab.

 

 

 

 

 

 
 

 

 

30 March 2008

Showing steel reinforcing detail

 

 

 

 

 

 
 

 

 

 

 

30 March 2008

Showing waste pipes within the base

 

 

 

 

 

 

 

Picture below shows room layouts

 

 
 

 

 
 

 

 

1 April 2008

Concrete poured for the ground floor slab on 30th March.

 

 

 

 

 

 
 

 

 

1 April 2008

Another view

 

 

 

 

 

 
 

 

 

1 April 2008

Stairs down to the basement from
the Kitchen.

 

 

 

 

 
 

 

 

1 April 2008

Stairs up from the basement.

 

 

 

 

 
 

 

 

1 April 2008

Part of the basement showing ceiling
(lounge floor) supports.

 

 

 

 

 
 

 

 

11 April 2008

Ironwork completed for the pillars.
Shuttering will now be constructed round the ironwork and then concrete poured in.
Should be completed next week.

 

 

 

 

 
 

 

  11 April 2008

Showing ironwork detail.

 

 

 

 

 

 
 

 

 

20 April 2008

Finishing off the shuttering for the pillars.

Update: Concrete was poured for the pillars on 21 April.

 

 

 

 
 

 

 

25 April 2008

Shuttering removed. It is now Easter in Cyprus. Work will not resume untill around 5 May.

 

 

 

 

 

 
 

 

 

25 April 2008

View of basement space from veranda.
In this space is the 'self contained' studio and the utility room. Mostly out of site to the left is the storage / workshop space.

 

 

 

 

 
 

 

 

25 April 2008

View from inside the basement studio looking towards the studio veranda.

 

 

 

 

 

 
 

 

 

25 April 2008

Beyond the pillar is workshop / storage space with access from the veranda and from inside.

 

 

 

 

 
 
  Next Page   May - Jun 08