6 February 2009
Nearly finished at the rear..
|
|
|

|
|
6 February 2009
Fireplace finished.
|
|
|
|
|
6 February 2009
Shower in ensuite wet room
|
|
|

|
|
6 February 2009
All doors and door handles now fitted. This is the second bedroom.
|
|
|

|
|
6 February 2009
Kitchen nearly complete.
|
|
|

|
|
6 February 2009
Doors along hallway.
The inside of the house is now about a week away from being finished.
Occupation now depends on the completion of the essential external jobs
including:
Covered pergola over veranda
Barbeque & units on veranda
Water supply to property
Electrical supply to property
Driveways
Paths down sides
Sceptic tank and drainage
|
|
|

|
|
8 February 2009
Utility room finished apart from door handles. Space for large fridge
and washing machine.
|
|
|

|
|
14 February 2009
Washbasin in en suite.
No progress over the last week apart from carpenter finishing off inside.
|
|
|

|
|
22 February 2009
Very little progress since 8th Feb. This is the barbecue being assembled.
|
|
|

|
|
22 February 2009
Nice large barbecue (good for parties)
and includes a sink.
|
|
|

|
|
22 February 2009
A 'plaque' inlaid into the wall in the porch.
|
|
|

|
|
22 February 2009
Some of the 'plaques' inlaid in to the wall of the lobby. They will all
be painted over the same colour as the wall.
|
|
|

|
|
14 March 2009
Air conditioning units on external walls.
|
|
|

|
|
14 March 2009
Air conditioning unit in kitchen
|
|
|

|
|
14 March 2009
Barbecue unit fitted on veranda.
No real progress since 8th February. Very disappointing. This project
is now 12 months late. I'm glad we have penalty clauses in the contract.
|
|
|

|
|
29 March 2009
Hot and cold water tanks plus solar panel on flat roof. The hot water
is heated by the solar panel whenever the sun is shining. It can also
be heated by the central heating and by immersion heater.
The stonework has been pointed.
|
|
|

|
|
29 March 2009
The cover for the veranda under construction.
|
|
|

|
|
29 March 2009
Another picture of the covered veranda. The roof will be tiled and railings
provided along the front.
Some good news - after the torrential rain this last week, the basement
remained dry.
|
|
|

|
|
5 April 2009
Drives compacted with hardcore and shuttering along sides. Steel reinforcing
will be placed on drive before concrete poured.
|
|
|

|
|
5 April 2009
Drive taken from the other entrance.
A lot of landscaping to be done after we move in, now who can I call on
to help?
|
|
|

|
|
5 April 2009
Roof finished on covered veranda.
|
|
|

|
|
6 April 2009
The drives being concreted. An important milestone which allows the last
set of jobs to be finished.
|
|
|

|
|
6 April 2009
The pad on the left is for the electric meter enclosure.
|
|
|

|
|
6 April 2009
Man-handling the concrete pump.
|
|
|

|
|
6 April 2009
The manhole is for the water supply.
|
|
|
|
|
6 April 2009
Another view. The drive will be finished today and walkable tomorrow.
|
|
|

|
|
9 April 2009
Driveway useable, central heating units being delivered.
|
|
|

|
|
16 April 2009
More concrete arriving, this time for the path around sides of house
and the base for the gas tank and satellite dish.
|
|
|

|
|
16 April 2009
Concrete around the front and left side.
|
|
|

|
|
16 April 2009
Concrete slab for gas tank and dish.
|
|
|

|
|
16 April 2009
Kitchen appliances installed.
Oven and microwave and dishwasher to the left.
|
|
|

|
|
16 April 2009
Hob and sink.
|
|
|

|
|
16 April 2009
Radiators installed.
We have decided to move in on 28th April whether or not the house is
ready.
At the time of writing there is no electric and no sceptic tank for waste
as well as many other jobs not yet completed.
Watch this space for World War 3.
|
|
|

|
|
17 May 2009
We moved in as planned on 28th April and are now finally getting a bit
straight.
No world war, and generator and services were done in the nick of time.
|
|
|

|
|
17 May 2009
Covered Veranda.
|
|
|

|
|
17 May 2009
Lower veranda
|
|
|

|
|
3 May 2009
Barbecue on my birthday.
I feel a lot older than 34!
|
|
|

|
|
3 May 2009
It was a cold day.
|
|
|

|
|
17 May 2009
Sorting the office.
|
|
|

|
|
17 May 2009
The diesel generator which is supplying electricity, and a 1000 Litre
diesel oil tank.
|
|
|

|
|
17 May 2009
The pool pump and filter. The room is not completed..
|
|
|

|
|
17 May 2009
Satellite dish and 1000 lt propane gas tank.
|
|
|
|
|
17 May 2009
The boiler room (central heating) which will also hold garden tools etc.
|
|
|

|
|
17 May 2009
Boiler room has been built filling a corner. Door still to be fitted.
|
|
|

|
|
17 May 2009
A lot of the rubbish has been cleared away.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|