Custom Build Bungalow at Arodes

 

Click for Paphos, Cyprus Forecast

Click here for Jan 12 - to date    The Latest

Click here for Sep 11 - Dec 11    

Click here for Sep 10 - Aug 11  

Click here for Dec 09 - Jul 10

Click here for Aug -Nov 09

Click here for May - Jul 09

Click here for Feb - Mar 09

This page = Dec - Jan 09

Click here for Oct - Nov 08

Click here for Jul - Sep 08

Click here for May - Jun 08

Click here for Mar - Apr 08

Click here for Jan - Feb 08

Click here for Nov - Dec 07

Click Here for Sep - Oct 07 

Click here for Oct 06 - Aug 07   The Start

Click here for Plan View

 

 

 

 

 

10 December 2008

Stonework around the porch.

 

 

 

 

 
 

 

 

10 December 2008

Close up of stonework. We are very pleased with the design with each piece of stone cut to shape by hand.

 

 

 

 

 
 

 

 

10 December 2008

Concrete base laid around the pool and down to the basement ready for tiles.

 

 

 

 

 
 

 

 

10 December 2008

Another view of the slope down to the Gum Tree Guest Suite on the lower floor.

 

 

 

 

 
 

 

 

13 December 2008

Stonework round porch completed and stone capping on retaining wall.

 

 

 

 

 
 

 

 

13 December 2008

Stone edging round both tiled verandas.

 

 

 

 

 

 
 

 

 

13 December 2008

Pool and surround which will be tiled, picture taken from the covered veranda.

 

 

 

 

 
 

 

 

13 December 2008

Marble steps down to the basement studio.

 

 

 

 

 
 

 

 

13 December 2008

Basement veranda - walls rendered and capped with stone.

 

 

 

 

 
 

 

 

13 December 2008

Nice space at one end of pool. This area is now ready for tiling.

 

 

 

 

 

 
 

 

 

13 December 2008

Stone steps between verandas.

 

 

 

 

 
 

 

 

25 December 2008

No progress at all since 13th Dec. Still waiting for doors and windows and in the last few days we have had storms and torrential rain which has flooded most floors. Not our best Christmas !!

 

 

 

 
 

 

 

31 December 2008

Most doors and windows fitted.

Now the inside is secure and weatherproof, we hope to see rapid progress by the carpenter, plumber and electrician.

 

 

 

 
 

 

 

31 December 2008

We asked for window sills to be exposed on the inside, which is not normal practice in Cyprus.

 

 

 

 
 

 

 

31 December 2008

Left hand side.

 

 

 

 
 

 

 

31 December 2008

Part of the lounge

 

 

 

 
 

 

 

31 December 2008

The Gum Tree Visitors suite in the
basement.

 

 

 

 
 

 

 

31 December 2008

A blonde prowler caught on camera
at the rear

 

 

 

 
 

 

 

6 January 2009

Stone work finished and most windows and doors fitted

 

 

 

 

 
 

 

 

6 January 2009

Kitchen unit carcass's made off site and delivered.

 

 

 

 

 
 

 

 

6 January 2009

Door frames in position

 

 

 

 

 

 

 

 
 

 

 

6 January 2009

Built in cupboards in the office.

 

 

 

 

 

 

 

 
 

 

 

6 January 2009

Built in wardrobe in second bedroom.

Design is white oak.

 

 

 

 

 

 
 

 

 

11 January 2009

Kitchen units being built. Design is white doors, black worktop.

Appliances include - oven, microwave, built in fridge, dish washer, hob, sink.

 

 

 

 

 
 

 

 

11 January 2009

Units being built in Utility room. Appliances include a full size fridge, washing machine and sink.

 

 

 

 
 

 

 

11 January 2009

Basement veranda and walkway ready for tiling.

 

 

 

 
 

 

 

11 January 2009

Coping stones fitted to pool. The pool area is now ready for tiling.

 

 

 

 
 

 

 

14 January 2009

Basement patio tiled

 

 

 

 

 
 

 

 

14 January 2009

We have a front door. The house is now secure.

 

 

 

 

 
 

 

 

14 January 2009

Stone around the pillars that will support the roof of the covered veranda.

 

 

 

 

 
 

 

 

16 January 2009

Tiling in main bathroom.

 

 

 

 

 

 

 

 
 

 

 

16 January 2009

Tiling in en-suite bathroom.

 

 

 

 

 

 

 
 

 

 

16 January 2009

Start of tiling round the pool.

 

 

 

 
 

 

 

21 January 2009

Start of build of fireplace. It will be faced in stone.

 

 

 

 

 
 

 

 

21 January 2009

Built in wardrobe in the basement studio.
Man in doorway is painting in the store room.

 

 

 

 
 

 

 

21 January 2009

Colour swatches on the wall, more decisions, don't like any of these!!

 

 

 

 

 
 

 

 

23 January 2009

Progress on the fireplace and the
chimney is built external.

 

 

 

 

 

 

 

 
 

 

 

23 January 2009

Tiling finished in the bathrooms.

 

 

 

 

 

 

 
 

 

 

23 January 2009

Tiling up the ramp.

 

 

 

 

 
 

 

 

28 January 2009

Second coats of paint on outside.

 

 

 

 

 
 

 

 

28 January 2009

Fitted wardrobes in second bedroom.

 

 

 

 

 

 

 
 

 

 

28 January 2009

Fitted wardrobes in master bedroom.

 

 

 

 
 

 

 

28 January 2009

Fitted wardrobes in basement studio.

 

 

 

 
         
         
         
     